Complete Epoxy Floor Checklist
Get a floor that lasts 10-20 years. Preparation is everything with epoxy.
Before Installation
- Choose finish: standard, metallic, flake, or quartz
- Decide on color and flake blend (if applicable)
- Clear the space completely — nothing can be on the floor
- Check concrete moisture — must be below 4 lbs/1000 sq ft (calcium chloride test)
- Repair any cracks or spalling before coating
- Get 3+ quotes specifying prep method (grind vs. acid etch)
What to Ask Contractors
- Do you diamond-grind or acid-etch? (grinding is superior)
- What is the coating thickness in mils?
- How many coats? (primer + base + topcoat minimum)
- What is the pot life and cure time?
- Is UV-stable topcoat included for sun-exposed areas?
- Warranty on peeling, delamination, and hot-tire pickup?
After Installation
- Stay off the floor for 24 hours (foot traffic) and 72 hours (vehicle traffic)
- Avoid dragging heavy items for first week
- Clean spills promptly — especially oils and solvents
- Use soft-bristle broom or microfiber — avoid abrasive cleaners
- Reapply topcoat every 3-5 years for high-traffic areas